Derm-Maxx®

Sterilized Room Temperature Human Dermis Graft | Q4238

Product Details

Derm-Maxx® is a sterilized, dehydrated amniotic membrane covering distinguished by a proprietary preservation method that retains all native layers of the placental membrane, including the amnion, chorion, and spongy layer intact. This physician-friendly allograft is produced without unnecessary chemicals, antibiotics, or preservatives, allowing it to preserve the comprehensive collagen matrix and key components. Durable and easily applied to both acute and chronic wounds, DermaBind FM can be stored at room temperature for up to three years.

Helpful Resources

Fact Sheet

Reimbursement Guide

Derm-Maxx®, a sterilized dehydrated amniotic membrane, is processed to preserve its comprehensive collagen matrix, glycoconjugates, and glycosaminoglycans.

Utilizing a proprietary method, this allograft retains all native layers of the placental membrane, specifically including the amnion, chorion, and the spongy layer intact.

The manufacturing process for Derm-Maxx® avoids unnecessary chemicals, antibiotics, or preservatives, resulting in a durable, easy-to-apply product that is never frozen and stores at room temperature for up to 3 years.

Derm-Maxx® is intended as a protective wound covering for a wide array of conditions, including diabetic foot ulcers, venous leg ulcers, and trauma wounds, usable at the discretion of the treating physician.

Size Guideline

We would love to hear from you

Other Products

Amniotic Allografts

Amnio-Max®
AmnioDefend™ FT
PalinGen
AmchoPlast™
Shelter™
Sentry SL™
Derm-Maxx®
BIOVANCE®
Scroll to Top